New electric coiled tubing in The Netherlands!
Last month, the new Electric Coiled Tubing Power Pack was trialled during operations for a major customer in The Netherlands. Both the customer and the Well Services Group have been looking into an opportunity to trial the Power Pack for over two years with the development of the Power Pack being completed at the end of 2023.
Using the Electric Power Pack greatly reduces emissions when compared to a conventional diesel-driven unit, and in this case even more emission reduction was possible as it was connected straight to the grid. This was of particular importance as the operations took place within an environmentally sensitive location.
The Power Pack was considered an overall success and our customer is looking into options to utilize the Electric CT Power pack whenever possible on future operations.